2013-2014 Social Services Center, Brașov – RO
The old building of the Astra High School was completely transformed until April 2014, when the “Social City Hall” of Brașov began its activity in this building.
The building was reinforced on all three levels, using over 100 tons of reinforced concrete. The aim pursued by the ongoing works refers to the creation of an environment necessary for carrying out activities specially designed for people with disabilities, special needs, people in difficulty. Thus, a lighting system specific to people with disabilities with warm light and low energy consumption was installed throughout the building.
Facts & Figures
General contractor::
Type: Healthcare Center
Status: completed
Usable area: – m²
Client: –
Electra contractor: –
Construction time: –
Togheter with Griffe Building/Grey Dot Srl Brașov, with the same team from the previous project, we completed the low voltage instalation (security systems, fire prevention systems, data and CCTV).
Let’s Talk About Your Project
Send an Email
info@leuce.net
Call Us
+31-631-533-313
Address
Kerkrade – Netherlands